首页> 外文期刊>Asian Power >What hydropower ranking can do for generation expansion
【24h】

What hydropower ranking can do for generation expansion

机译:水电排名可以为发电量增加做些什么

获取原文
获取原文并翻译 | 示例
           

摘要

Mobilization of financing for power sector infrastructure development must be founded on a sound basis of technical, environmental, social, economic and financial principles. In Asia, when considering hydropower development as a key element of the generation expansion, it is extremely important to perform a comprehensive ranking of available projects to select those that can be developed according to industry best practices. When compared to some other generation options, hydropower development offers challenges due to the nature of environmental and social impacts, the importance of site conditions, reliability of hydrological information, and the dominance of the civil works in construction. Ranking of potential hydropower projects must consider these challenges to arrive at a selection of projects that will be attractive for financing.
机译:必须在技术,环境,社会,经济和金融原则的良好基础上,为电力部门基础设施发展筹集资金。在亚洲,将水电开发作为发电量扩展的关键要素时,对可用项目进行全面排名以选择可以根据行业最佳实践开发的项目非常重要。与其他发电方式相比,水电开发由于环境和社会影响的性质,工地条件的重要性,水文信息的可靠性以及土建工程在建筑中的主导地位而面临挑战。潜在水电项目的排名必须考虑这些挑战,以选择出对融资有吸引力的项目。

著录项

  • 来源
    《Asian Power》 |2013年第58期|6-6|共1页
  • 作者

    PETER J. RAE;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号