首页> 外文期刊>Asian Power >THE CHARTIST: INDIA'S POWER CAPACITY ADDITION TO TAPER OFF
【24h】

THE CHARTIST: INDIA'S POWER CAPACITY ADDITION TO TAPER OFF

机译:特权:印度的功率容量逐渐减少

获取原文
获取原文并翻译 | 示例
           

摘要

CLSA expects -75GW generation capacity addition in India's 12th Five year plan. However, unlike most of the earlier plan periods, CLSA expects the 12th plan to be front ended. "With most of the private developers not announcing fresh capex plans for last 12-18 months the capacity addition is likely to taper off in FY17-18. There is likelihood that the near term capacity addition might also see some delays as a number of power projects are already being executed at a very slow pace!' says CLSA analyst Abishek Tyagi. This, he says, is also reflected in sluggish revenue growth and poor order booking for EPC players such as BHEL, L&T etc in the power sector.
机译:里昂证券(CLSA)预计印度的“十二五”计划将增加-75GW的发电能力。但是,与大多数早期计划时期不同,里昂证券协会(CLSA)希望第12个计划处于前端。 “由于大多数私人开发商并未宣布过去12-18个月的新资本支出计划,因此17-18财年的产能增加可能会逐渐减少。近期的产能增加可能还会由于一些电力而出现一些延迟。项目已经以非常缓慢的速度执行!”里昂证券的分析师Abishek Tyagi说,这也反映在电力行业BHEL,L&T等EPC参与者的收入增长缓慢和订单预订不佳上。

著录项

  • 来源
    《Asian Power》 |2014年第62期|9-9|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号