首页> 外文期刊>Asian Power >FROM THE EDITOR
【24h】

FROM THE EDITOR

机译:来自编辑

获取原文
获取原文并翻译 | 示例
           

摘要

The second quarter of Asian Power in 2020 tackles the issues in deploying technologies that could potentially hamper China from meeting its 58GW nuclear target. The demand for safer 3G technology and the requirements for plants to have proven successful operations have resulted in first-of-a-kind reactors meeting schedule overruns and tech hurdles. Find out more on page 14. Going downstream, hydropower development on the Mekong river is facing threats ranging from droughts to cross-border tensions. Despite these, Vietnam is keen to bolster this sector through incentivising small-scale projects, and so far there are 138 under construction. Read more on page 12.
机译:2020年亚洲权力的第二季度解决了部署技术中的问题,可能妨碍中国履行58GW核目标。对更安全的3G技术的需求以及植物的要求已经证明了成功的业务导致了一流的反应堆会议时间表超支和技术障碍。在第14页的了解一下。下游,湄公河上的水电开发面临着从干旱到跨境紧张局势的威胁。尽管如此,越南通过激励小规模项目,越南热衷于这个部门,到目前为止正在建设中有138人。阅读更多第12页。

著录项

  • 来源
    《Asian Power》 |2020年第96期|1-1|共1页
  • 作者

    Tim Charlton;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号