首页> 外文期刊>Asian Power >Hydropower backlash and policy gaps plague Lower Mekong
【24h】

Hydropower backlash and policy gaps plague Lower Mekong

机译:水电反弹和政策差距瘟疫下湄公河

获取原文
获取原文并翻译 | 示例
           

摘要

The Lao government was forced to suspend the approval of new dams and require impact studies for other projects in the pipeline after the Se-Pian Se Nam Noi dam collapsed and killed dozens in 2018. Early this year, the Mekong River Commission (MRC) proposed impact mitigation and risk management measures for the Pak Lay hydropower project, the fourth of eleven projects planned in the lower Mekong river. However, experts still raised concerns over this project and the others, stating that another collapse should be avoided at all costs.
机译:老挝政府被迫暂停新大坝的批准,并在2018年SE-PIAN SE NAM NOI DAM折叠和杀死时,在管道中对其他项目进行影响研究。今年年初,湄公河委员会(MRC)提出湄公河下湄公河下的第四个项目的第四个项目影响缓解和风险管理措施。然而,专家仍然提出了对该项目和其他项目的担忧,说明应避免所有费用。

著录项

  • 来源
    《Asian Power》 |2019年第92期|20-21|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号