Scheduling Two-Agents with a Time-Dependent Deterioration to Minimize the Minsum Earliness Measures

机译:安排具有时间依赖性恶化的两个代理商以最小化早期总和测度

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

This paper considers a new scheduling model in which both two-agents and a time-dependent deterioration exist simultaneously. By the time-dependent deterioration, it means that the actual processing time of a job belonging to the two-agents is defined as a non-decreasing linear function of its starting time. Two-agents compete to perform their respective jobs on a common single-machine and each agent has his own criterion to be optimized. The aim is to focus on minimizing total (weighted) earliness cost of one agent, subject to an upper bound on the maximum earliness cost of the other agent. The main contribution of this paper is to propose the optimal properties and present the complexity results for the problems addressed here.
机译:本文考虑了一个新的调度模型,其中同时存在两个代理和一个与时间有关的恶化。通过时间相关的恶化,这意味着将属于两个代理的作业的实际处理时间定义为其开始时间的线性递减函数。两个代理竞争在一个通用的单台计算机上执行各自的工作,每个代理都有自己的标准要优化。目的是集中于最小化一个代理商的总(加权)早期成本,但要以另一代理商的最大早期成本的上限为上限。本文的主要贡献是提出最佳性能,并提出解决此处问题的复杂性结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号