In July 2012, the Army fielded the first 81 of approximately 1,600 advanced medium mobile power sources (AMMPS) generators planned for units in Afghanistan over the next year. These new generators range in size from 5 to 60 kilowatts and are expected to be distributed to as many as 15 outposts to replace tactical quiet generators.
展开▼