首页> 外文期刊>Archives of Civil Engineering >IMPACT OF BASELINE TERMS ON THE COURSE OF CRITICAL PATHS AND TIME BUFFERS IN THE MODIFIED GOLDRATT'S METHOD
【24h】

IMPACT OF BASELINE TERMS ON THE COURSE OF CRITICAL PATHS AND TIME BUFFERS IN THE MODIFIED GOLDRATT'S METHOD

机译:基线术语对改进的Goldratt方法中关键路径和时间缓冲程序的影响

获取原文
获取原文并翻译 | 示例
           

摘要

The introduction of a baseline term to the dependency network most often results in a change, break and/or generation of a new sequence of critical path, depending on the type of such a baseline term and the exact date selected. Each of those situations has an impact on the location or need to include new time buffers in the modified Goldratt's method. The purpose of this article was to identify possible effects brought by declaration of each type of baseline term and to point out actions to be taken in each case. It must be noted that guidelines provided should in each individual case be adapted to the specific character of schedule changes caused by implementation of the relevant baseline term. The example presented herein exemplifies one of such solutions to be implemented as a result of break of the critical path and need to introduce new time buffers.
机译:将基线术语引入依赖项网络通常会导致更改,中断和/或生成新的关键路径序列,具体取决于此类基线术语的类型和所选的确切日期。这些情况中的每一种都会影响位置,或者需要在改进的Goldratt方法中包括新的时间缓冲。本文的目的是确定声明每种基准术语类型可能带来的影响,并指出每种情况下应采取的措施。必须指出的是,在每种情况下,所提供的指南都应适应因实施相关基准期限而引起的时间表变更的特定特征。本文提出的示例示例了由于关键路径中断而需要实施的此类解决方案之一,并且需要引入新的时间缓冲区。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号