An Integrated System for Design/Build Firms to Solve Cost Estimation Problems in the Design Phase

机译:设计/建造公司的集成系统,可解决设计阶段的成本估算问题

获取原文
获取原文并翻译 | 示例
       

摘要

One of the basic problems that architects encounter during the design process are keeping costs within the budget given by the client and warning the client about the impacts on building costs of various decisions. The calculation of the impacts of alternative decisions on the cost of the building must be a continuous activity. The models developed for architectural practices and construction companies should provide tools that integrate this activity into the buildingproduction process. In certain project delivery systems, e.g., design/build, the continuity and integration of the cost estimation function gains importance. That is why the cost estimation system should be designed not only to meet the requirements of a particular phase of a project (i.e., design, bidding, construction, or operation) or a certain type of firm that undertakes the project (i.e., architectural office, client organization, or contracting company) but also to integrate the information systems used by the organizations undertaking different roles in the various phases of the building production process. This paper presents an integrated system (MITOS) and its cost estimation module that have been designed primarily for design/build firms, i.e., firms or alliances of firms that do both design and construction. The cost estimation module was designed to achieve integration and continuity of the cost estimation function by introducing a model that is based on project-based productivity information in similar past projects.
机译:架构师在设计过程中遇到的基本问题之一是将成本保持在客户提供的预算之内,并警告客户各种决策对建筑成本的影响。替代决策对建筑物成本的影响的计算必须是连续的活动。为建筑实践和建筑公司开发的模型应提供将这一活动整合到建筑生产过程中的工具。在某些项目交付系统中,例如设计/建造中,成本估算功能的连续性和集成性变得越来越重要。这就是为什么成本估算系统不仅应设计为满足项目特定阶段(即设计,招标,施工或运营)的要求,还应满足承担该项目的特定类型公司(即建筑事务所)的要求,客户组织或承包公司),还可以集成在建筑物生产过程的各个阶段中扮演不同角色的组织所使用的信息系统。本文介绍了一个集成系统(MITOS)及其成本估算模块,该系统主要是为设计/建造公司(即同时进行设计和建造的公司或公司联盟)设计的。成本估算模块旨在通过引入基于类似过去项目中基于项目的生产率信息的模型来实现成本估算功能的集成和连续性。

著录项

  • 来源
    《Architectural science review》 |2003年第1期|p.37-47|共11页
  • 作者

    Alaattin Kanoglu;

  • 作者单位

    Division of Construction Management, Faculty of Architecture, Istanbul Technical University, 80191 Taskisla -Taksim, Istanbul, Turkey;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 房屋建筑设备;
  • 关键词

  • 入库时间 2022-08-18 00:28:29

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号