The Procurement of the feeder system for The International Thermonuclear Experimental Reactor (ITER) tokamak device started in ASIPP (China) in 2006. The relevant tasks of structural design and analysis have now come to an end, but the R&D activities started in 2009 for critical feeder components and key technology are still ongoing. Following the signature of the Procurement Arrangement between China and the ITER Organization (IO) in 2010, a great number of R&D tasks have been launched with the purpose of testing and verifying the original design, leading to design changes and optimizations. This paper mainly discusses the progress of the feeder design and R&D activities; it also presents some test results.
机译:国际热核实验堆(ITER)托卡马克装置的进料器系统的采购于2006年在ASIPP(中国)开始。结构设计和分析的相关任务现已结束,但针对关键技术的研发活动于2009年开始馈线组件和关键技术仍在进行中。自2010年中国与国际热核实验堆组织(IOR)签署采购协议以来,已经开展了大量的研发任务,目的是测试和验证原始设计,从而导致设计变更和优化。本文主要讨论了馈线设计和研发活动的进展;它还提供了一些测试结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号