首页> 外文期刊>Applied Energy >First Decade of Large-Power Gas Turbines in Nigeria
【24h】

First Decade of Large-Power Gas Turbines in Nigeria

机译:尼日利亚第一个大功率燃气轮机十年

获取原文
获取原文并翻译 | 示例
           

摘要

This is an appraisal of the performance of the four 75 MW gas turbines (GTsj, i.e. the first large-power generating GTs installed in Nigeria. All the major parameters considered—availability, utilization and capability factors—were much lower than acceptable. The frequency of failures of some vital components of the machines is also higher than normal. The general low performance is linked to some peculiar environmental conditions of the place and circumstances of the country, which make the design of certain parts of the GTs inadequate.
机译:这是对四台75 MW燃气轮机(GTsj,即尼日利亚安装的第一台大型发电GT)的性能的评估。考虑的所有主要参数(可用性,利用率和能力因子)都远远低于可接受的范围。机器某些重要部件的故障率也高于正常水平,普遍的低性能与该国所处位置和环境的某些特殊环境条件有关,这使得GT的某些部分的设计不充分。

著录项

  • 来源
    《Applied Energy》 |1995年第3期|p.213-222|共10页
  • 作者

    H. I. Hart;

  • 作者单位

    Mechanical Engineering Department, Rivers State University of Science and Technology, Port Harcourt, Nigeria;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 能源与动力工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号