首页> 外文期刊>Applied Energy >Thermal performance evaluationof an energy and environmental research center building during winter
【24h】

Thermal performance evaluationof an energy and environmental research center building during winter

机译:能源与环境研究中心大楼冬季热性能评估

获取原文
获取原文并翻译 | 示例
       

摘要

The building is constructed on a ground area of 3300 m~2 and consists fo five floors of total area of 6361 m~2 with an air conditioned area of 3351 m~2. The heating system comprises 1577 evacuated-tube collectors, two accumulation tanks of 15 m~3 each, two thermal storage tanks of 150 m~3 each, two auxiliary boilers of 443, 000 kcal/h each, pumps, heat exchangers and control equipment.
机译:该建筑建筑面积为3300 m〜2,由五层楼组成,总面积为6361 m〜2,空调面积为3351 m〜2。加热系统包括1577个真空管集热器,两个每个15 m〜3的储罐,两个每个150 m〜3的储热罐,两个每个443、000 kcal / h的辅助锅炉,泵,热交换器和控制设备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号