首页> 外文期刊>Applied Energy >Development of photovoltaic power plant for remote residential applications: The socio-technical and economic perspectives
【24h】

Development of photovoltaic power plant for remote residential applications: The socio-technical and economic perspectives

机译:用于偏远住宅应用的光伏电站的开发:社会技术和经济角度

获取原文
获取原文并翻译 | 示例
           

摘要

This paper concentrates on the development of a Photovoltaic Power Generation Plant (PPGP) for a remote mini-estate of 24 households, based on the socio-technical and the economic perspectives. This integrated approach presents a comprehensive framework for understanding the development of energy for remote communities. The social lives and the needs of the people are first assessed, followed by the components design and modeling of the PPGP in DIgSILENT PowerFactory tool, taking into account the hourly generation and demand for different seasons. A 400 V, 50 Hz three-phase output is produced from the plant via a static converter component; AC unbalanced load flow and the quasi-dynamic simulations are also run to ascertain the generation, busbar voltages, line loadings and losses in the system, over a 24-h period. While the PPGP performance is also being investigated, the economic analysis is done by employing life cycle cost analysis. The implementation challenges are highlighted and some recommendations are made as well. The locality of Gwagwalada, Nigeria is used as a case study. Results reveal that the social aspect plays a significant role in the design, planning, implementation and management of the plant. It further indicates that the proposed plant has the potential to provide a continuous and cost-effective power supply for the users during different seasons, compared to a conventional off-grid option. (C) 2015 Elsevier Ltd. All rights reserved.
机译:本文基于社会技术和经济观点,着重于为24户偏远地区的小型家庭开发光伏发电站(PPGP)。这种综合方法为理解偏远社区的能源发展提供了一个全面的框架。首先评估社交生活和人们的需求,然后考虑DIGSILENT PowerFactory工具中PPGP的组件设计和建模,并考虑不同季节的每小时发电量和需求。通过静态转换器组件从工厂产生400 V,50 Hz的三相输出。还运行AC不平衡负载流和准动态仿真,以确定系统在24小时内的发电量,母线电压,线路负载和系统损耗。在对PPGP的性能进行调查的同时,通过使用生命周期成本分析来进行经济分析。突出了实施方面的挑战,并提出了一些建议。案例分析了尼日利亚瓜瓦瓦拉达(Gwagwalada)的地区。结果表明,社会方面在工厂的设计,规划,实施和管理中起着重要作用。这进一步表明,与常规离网方案相比,拟建的电厂有潜力在不同季节为用户提供连续且具有成本效益的电源。 (C)2015 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号