...
首页> 外文期刊>Applied Energy >Operational optimization of a grid-connected factory with onsite photovoltaic and battery storage systems
【24h】

Operational optimization of a grid-connected factory with onsite photovoltaic and battery storage systems

机译:具有现场光伏和电池存储系统的并网工厂的运营优化

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Driven by fast advancements in wind and photovoltaic (PV) technologies, onsite renewable electricity generation is becoming attractive to manufacturers since they are able to reduce electricity purchases from the grid and may lower their electricity costs. This paper proposes a methodology to minimize the electricity cost of a grid-connected factory that also has onsite solar power generation and battery storage. Purchases from the grid are subject to time-of-use electricity rate schedules. The problem is formulated as a mixed-integer programming problem and GAMS is used to find the optimal manufacturing and onsite energy flow schedules that have the minimal electricity cost. A case study with one hybrid flow shop, onsite PV power generation, and a battery was used to test the proposed method. Testing results showed that the factory's electricity cost can be reduced by 54.0% under summer TOU rate on a typical day while a 0.7% electricity cost reduction can be achieved for a representative day under a winter TOU rate. An annual electricity cost savings of 28.1% can be obtained with the optimal schedules. In addition, a parametric study incorporating the optimal schedules was performed to understand the economic performances associated with different PV capacity and battery bank size for the factory.
机译:在风能和光伏(PV)技术的飞速发展的推动下,现场可再生能源发电对制造商越来越有吸引力,因为它们能够减少从电网购买的电力并降低电费。本文提出了一种方法,以最大程度地减少同时具有太阳能发电和电池存储的并网工厂的电力成本。从电网购买须遵守使用时间电价表。该问题被表述为混合整数编程问题,GAMS用于查找具有最低电力成本的最佳制造和现场能流计划。以一个混合水流车间,现场光伏发电和电池为例,对所提出的方法进行了测试。测试结果表明,在典型的白天,工厂的电费成本可以在夏季的TOU费率下降低54.0%,而在冬季的TOU费率下,具有代表性的一天可以降低0.7%的电费。采用最佳计划,每年可节省28.1%的电力成本。此外,还进行了包含最佳计划的参数研究,以了解与工厂不同PV容量和电池组大小相关的经济性能。

著录项

  • 来源
    《Applied Energy》 |2017年第1期|1538-1547|共10页
  • 作者单位

    Purdue Univ, Sch Mech Engn, Ray W Herrick Lab, W Lafayette, IN 47907 USA;

    Purdue Univ, Sch Mech Engn, Ray W Herrick Lab, W Lafayette, IN 47907 USA;

    Tianjin Univ, Coll Management & Econ, Tianjin, Peoples R China;

    Purdue Univ, Sch Mech Engn, W Lafayette, IN 47907 USA|Purdue Univ, Div Environm & Ecol Engn, W Lafayette, IN 47907 USA;

    Purdue Univ, Div Environm & Ecol Engn, W Lafayette, IN 47907 USA;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Manufacturing scheduling; Energy optimization; Mixed-integer programming; Onsite renewable generation;

    机译:制造调度;能源优化;混合整数规划;现场可再生能源发电;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号