首页> 外文期刊>Annals of Operations Research >Innovative maintenance problem in a two-stage production-inventory system with imperfect processes
【24h】

Innovative maintenance problem in a two-stage production-inventory system with imperfect processes

机译:流程不完善的两阶段生产库存系统中的创新维护问题

获取原文
获取原文并翻译 | 示例
           

摘要

The specification of a product is frequently changed to satisfy new requirement from market buyers. To maintain market competitiveness, manufacturers must plan innovative production and sale strategies to achieve maximum benefit. This activity is known as innovative maintenance (IM). In this paper, we therefore consider a two-stage production-inventory model with replacement and imperfect component processes during which the components replacement is a common issue of IM. We then find the optimal production and sale strategies that minimize the total cost per unit time. An algorithm is proposed to find these optimal solutions. Finally, we quote two numerical examples from the Taiwan polyurethane industry to illustrate the proposed model and algorithm. Sensitivity analysis is also performed to obtain some managerial insights.
机译:产品规格经常更改,以满足市场购买者的新要求。为了保持市场竞争力,制造商必须计划创新的生产和销售策略,以实现最大的收益。此活动称为创新维护(IM)。因此,在本文中,我们考虑具有替换和不完善组件过程的两阶段生产库存模型,在此模型中,组件替换是IM的常见问题。然后,我们找到最佳的生产和销售策略,以使单位时间的总成本最小化。提出了一种找到这些最优解的算法。最后,我们引用台湾聚氨酯行业的两个数值示例来说明所提出的模型和算法。还执行敏感性分析以获得一些管理洞察力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号