...
首页> 外文期刊>Annals of Operations Research >Workforce-constrained maintenance scheduling for military aircraft fleet: a case study
【24h】

Workforce-constrained maintenance scheduling for military aircraft fleet: a case study

机译:受军人约束的军机机队维修计划:一个案例研究

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The problem is related to a fleet of military aircraft with a certain flying program in which the availability of the aircraft sufficient to meet the flying program is a challenging issue. During the pre- or after-flight inspections, some component failures of the aircraft may be found. In such cases, the aircraft are sent to the repair shop to be scheduled for maintenance jobs, consisting of failure repairs or preventive maintenance tasks. The objective is to schedule the jobs in such a way that sufficient number of aircrafts is available for the next flight programs. The main resource, as well as the main constraint, in the shop is skilled-workforce. The problem is formulated as a mixed-integer mathematical programming model in which the network flow structure is used to simulate the flow of aircraft between missions, hanger and repair shop. The proposed model is solved using the classical Branch-and-Bound method and its performance is verified and analyzed in terms of a number of test problems adopted from the real data. The results empirically supported practical utility of the proposed model.
机译:该问题与具有一定飞行程序的军用飞机机队有关,其中足以满足飞行程序的飞机的可用性是具有挑战性的问题。在飞行前或飞行后检查中,可能会发现飞机的某些组件故障。在这种情况下,飞机会被送往修理厂安排维修工作,包括故障修理或预防性维护任务。目的是安排作业,以便有足够数量的飞机可供下一个飞行计划使用。车间中的主要资源和主要约束是熟练工人。该问题被公式化为混合整数数学规划模型,其中网络流动结构用于模拟任务,吊架和维修车间之间的飞机流动。使用经典的分枝定界法对提出的模型进行求解,并根据实际数据中采用的许多测试问题对模型的性能进行了验证和分析。结果从经验上证明了所提出模型的实用性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号