Bounds for parallel machine scheduling with predefined parts of jobs and setup time

机译:具有预定义的作业部分和设置时间的并行机器调度的界限

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

We examine a parallel machine scheduling problem with setup time in order to minimize the makespan. Each job consists of predefined parts, and the parts of a job can be processed concurrently in different machines. We first provide worst-case bounds of the Longest Processing Time and list schedules for special cases. We also develop a heuristic algorithm for scheduling parts of jobs with family setup time and propose its worst-case performance ratio. The application is the IoT-based smart factory with 3D printers as processing machines.
机译:我们检查带有设置时间的并行机器调度问题,以最小化制造时间。每个作业都包含预定义的部分,并且作业的各个部分可以在不同的机器中同时处理。我们首先提供最长处理时间的最坏情况界限,并列出特殊情况的时间表。我们还开发了一种启发式算法,用于安排带有家庭设置时间的部分工作,并提出其最坏情况下的性能比。该应用程序是基于IoT的智能工厂,带有3D打印机作为处理机。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号