The availability of alternating current power via the electrical grid is essential for safe operation and accident recovery of nuclear power plants (NPP). Loss of offsite power (LOOP), as an initiating event, contributes more than 26 percent to the core damage frequency (CDF) of generation II reactors. The LOOP event dramatically affects plant operations because it influences the mitigation responses by placing demands on the onsite power systems. The objective of this paper is the improvement of NPP stability against LOOP accident by utilizing the probabilistic safety assessment (PSA) methodology. In order to ameliorate the value of CDF due to LOOP, it is possible to modify the normal process of supplying electrical power to the crucial safety operations. The ability of a NPP to reduce power to house load operations allows the reactor to stay at power during temporary grid issues. House load operation is usually acceptable only for 30-40 min because of the poor quality of the generated steam. In this paper, by proposing a reheating system implemented on the steam collector of a VVER-1000 reactor, the house load operation is extended for a considerable period of time as a result of enhancing the steam quality. The obtained PSA results show significant decrease of the CDF, indicating improvement of NPP safety against LOOP. (C) 2018 Elsevier Ltd. All rights reserved.
机译:通过电网提供交流电对于安全运行和核电站的事故恢复至关重要。作为起始事件,场外功率损失(LOOP)对第二代反应堆的堆芯损坏频率(CDF)的贡献超过26%。 LOOP事件极大地影响了工厂的运行,因为它通过对现场电力系统提出要求来影响缓解响应。本文的目的是通过利用概率安全评估(PSA)方法来提高NPP对LOOP事故的稳定性。为了改善由于LOOP引起的CDF值,可以修改向关键安全操作供电的正常过程。核电厂减少功率以适应负荷运行的能力使反应堆在临时电网问题期间仍保持通电。由于产生的蒸汽质量差,通常只能在30-40分钟内进行室内负荷运行。在本文中,通过提出在VVER-1000反应堆的蒸汽收集器上实施的再加热系统,由于提高了蒸汽质量,室内负荷操作可延长相当长的一段时间。所获得的PSA结果显示CDF显着降低,表明NPP对抗LOOP的安全性得到了改善。 (C)2018 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号