...
首页> 外文期刊>Annals of nuclear energy >Component unavailability model for PSA Level Ⅰ applications considering aging and startup degradation: An Application to an Emergency Diesel Generator System
【24h】

Component unavailability model for PSA Level Ⅰ applications considering aging and startup degradation: An Application to an Emergency Diesel Generator System

机译:考虑老化和启动劣化的PSAⅠ级Ⅰ级应用组件不可用模型:紧急柴油发电机系统的应用

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The paper proposes an unavailability model, which considers standby component degradation due to repeated startups, including not only planned surveillance tests, but also additional startups due to real demands and, in cases when the component is detected failed in the planned test, extra tests related to corrective maintenance. The model is applied to evaluate the effect of additional tests on Emergency Diesel Generators from a Nuclear Power Plant's Onsite Power System. These additional tests are not considered in traditional reliability models. The results show that excessive Diesel Generator testing during its working life may lead to a significant increase of component unavailability with reflections on the core damage frequency at the end of its overhaul maintenance period. This increment could justify anticipation of Diesel Generator overhaul maintenance in one or two working cycles. (C) 2020 Elsevier Ltd. All rights reserved.
机译:本文提出了一种不可用的模型,该模型认为由于重复的初创企业,包括不仅是计划的监控测试,而且由于实际需求而等额外的启动,并且在计划测试中失败时,在计划的测试中失败,额外的测试 纠正维护。 该模型用于评估核电厂现场电力系统应急柴油发电机额外试验的效果。 在传统的可靠性模型中不考虑这些额外的测试。 结果表明,其工作寿命期间的过度柴油发电机测试可能导致在其大修维护期结束时对核心损坏频率的反射显着增加。 这种增量可以证明在一个或两个工作周期中的预期柴油发电机大规模维护。 (c)2020 elestvier有限公司保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号