首页> 外文期刊>American Water Works Association Journal >Sewer Modeling in Seattle Helps Ease Overflow Woes
【24h】

Sewer Modeling in Seattle Helps Ease Overflow Woes

机译:西雅图的下水道建模有助于缓解溢出问题

获取原文
获取原文并翻译 | 示例
           

摘要

The first permanent sewer in Seattle, Wash., was laid in 1883, and the original sewer trunk system was constructed between 1892 and 1911. Initially the sewers were constructed as a combined system, and untreated sewage was deposited in the convenient waters on both sides of the city. The early 1900s saw the start of construction providing partial separation of stormwater from sanitary flow. As the system expanded, some of the storm-water was separated, and the remaining wastewater was diverted for treatment to lessen the pollution load in the surrounding waters. Subsequently, several large trunks were built to link the many communities surrounding Lake Washington and on the eastern shore of Puget Sound with secondary waste-water treatment plants operated by King County, adjacent to Seattle.
机译:第一个永久性下水道于1883年在华盛顿州西雅图铺设,最初的下水道主干系统建于1892年至1911年之间。最初,下水道被构造为一个组合系统,未经处理的污水沉积在两侧方便的水中城市的。 1900年代初期,开始建造工程,将雨水与卫生流量部分隔离。随着系统的扩展,一些雨水被分离了,剩余的废水被分流处理,以减轻周围水体的污染负荷。随后,建造了几条大型干线,将华盛顿湖周围和普吉特海湾东岸的许多社区与毗邻西雅图的金县运营的二级污水处理厂连接起来。

著录项

  • 来源
    《American Water Works Association Journal》 |2006年第9期|p.34|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 市政工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号