首页> 外文期刊>American Water Works Association Journal >Testing and Monitoring Requirements for Class VI Wells
【24h】

Testing and Monitoring Requirements for Class VI Wells

机译:VI类井的测试和监控要求

获取原文
获取原文并翻译 | 示例
           

摘要

The following testing and monitoring activities are required of owners or operators of Class VI geologic sequestration (GS) injection wells during the life of the GS project. Mechanical integrity tests are conducted to confirm that the well maintains its internal and external mechanical integrity. These tests provide a means of measuring the adequacy of the construction of a Class VI injection well to ensure that carbon dioxide (CO_2) does not leak from the well and endanger underground sources of drinking water.
机译:在GS项目生命周期内,VI类地质封存(GS)注入井的所有者或经营者需要进行以下测试和监视活动。进行机械完整性测试以确认井保持其内部和外部机械完整性。这些测试提供了一种测量VI类注入井构造是否足够的方法,以确保二氧化碳(CO_2)不会从井中泄漏出来并危及地下饮用水源。

著录项

  • 来源
    《American Water Works Association Journal》 |2013年第11期|55-55|共1页
  • 作者

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号