...
首页> 外文期刊>American Water Works Association. Journal >HOBAS Used in Longest Large-diameter Sliplining Project on Record
【24h】

HOBAS Used in Longest Large-diameter Sliplining Project on Record

机译:HOBAS在有记录的最长大直径滑衬项目中的使用

获取原文
获取原文并翻译 | 示例
           

摘要

The installation lines were quite long for pipe of such large diameter, so the pushing force required to install the pipe had the potential to be high if the friction wasn't controlled. "The only issue with installing was to control the water to the level that would make the pipe neutrally buoyant.
机译:对于这么大直径的管道,安装线很长,因此如果不控制摩擦力,安装管道所需的推力可能会很高。 “安装的唯一问题是将水控制在一定水平,以使管道保持中性浮力。

著录项

  • 来源
    《American Water Works Association. Journal》 |2008年第11期|p.46-48|共3页
  • 作者

    Erin Boudreaux;

  • 作者单位

    - Erin Boudreaux is a marketing assistant at HOBAS Pipe USA in Houston, Texas. She recently received her MBA from Texas Tech University. She can be contacted at EBoudreaux@HobasPipe.com.;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号