...
首页> 外文期刊>The American Oil & Gas Reporter >Fast-Track Delivery Strategy For FPSO,Topside Modules Key To Jubilee's Success
【24h】

Fast-Track Delivery Strategy For FPSO,Topside Modules Key To Jubilee's Success

机译:FPSO快速交付策略,顶模块是禧年成功的关键

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

As the first significant development offshore the Republic of Ghana, the Jubilee Field was an ambitious world-class deepwater project in an area with no infrastructure. Ranking as one of the largest finds offshore West Africa in the past decade, the field's discovery has opened a significant hydrocarbon province in the Tano Basin in the Gulf of Guinea. Jubilee's development was executed on an aggressive fast-track schedule that advanced the project from discovery to first oil production in three and a half years. Meeting the aggressive development schedule required the fast-track execution of the turret-moored floating, production storage and offloading vessel, the Kwame Nkrumah.
机译:作为加纳共和国海上的第一个重大开发项目,禧年油田是一个雄心勃勃的世界级深水项目,位于无基础设施的地区。该油田的发现是过去十年来西非近海最大的发现之一,在几内亚湾的塔诺盆地开辟了重要的油气省。 Jubilee的开发是按照积极的快速进度计划进行的,该计划将项目从发现推进到三年半的首次石油生产。要满足激进的开发计划,就需要快速执行炮塔停泊的浮动,生产存储和卸载船Kwame Nkrumah。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号