【24h】

Turkish testers

机译:土耳其测试员

获取原文
获取原文并翻译 | 示例
           

摘要

As one of the final operators of the Phantom, the Turk Hava Kuvvetleri (THK, Turkish Air Force) has embarked on successive programmes to extend the jets' service life and increase capability. As long ago as August 24, 1995 an agreement was signed with the then Israel Aircraft Industries (IAI) covering structural and avionics work on 54 F-4Es. Of these aircraft, 26 were upgraded at IAI facilities and the rest at the 1. Hava ikmal Bakim Merkezi (1. HiBM, 1st Air Supply Maintenance Centre), in Eskisehir. After modernisation, the Phantom was redesignated as the F-4E 2020 Terminator. The project also established a system integration laboratory and an avionics testing and integration centre at the 1. HiBM. Today, these facilities the basis of 401 Test Filo - the THK's dedicated test and evaluation squadron.
机译:作为“幻影”的最终运营商之一,土耳其航空(Turk Hava Kuvvetleri)(土耳其空军THK)已着手进行后续计划,以延长喷气机的使用寿命并提高其能力。早在1995年8月24日,就与当时的以色列飞机工业公司(IAI)签署了一项协议,内容涉及54架F-4E的结构和航空电子工作。这些飞机中,有26架在IAI设施进行了升级,其余的在1.埃斯基谢希尔的Hava ikmal Bakim Merkezi(1。HiBM,第一航空供应维护中心)进行了升级。现代化之后,幻影被重新指定为F-4E 2020终结者。该项目还在1. HiBM建立了系统集成实验室和航空电子测试与集成中心。今天,这些设施成为了THK专门的测试和评估中队401 Test Filo的基础。

著录项

  • 来源
    《Airforces Monthly》 |2018年第368期|80-82|共3页
  • 作者

    Cem Dogut;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号