首页> 外文期刊>Air International >Recapitalization; C-130 on track, P-3 uncertain
【24h】

Recapitalization; C-130 on track, P-3 uncertain

机译:资本重组; C-130步入正轨,P-3不确定

获取原文
获取原文并翻译 | 示例
           

摘要

The Chief of the Navy Reserve said the recapitalization of its ailing C-130T and KC-130T Hercules transport fleet in on track for recapitalization by 2023, but recapitalization of its reserve patrol squadrons is uncertain. Testifying on April 17, 2018, before the Senate Appropriations Defense subcommittee, Vice Admiral Luke McCollum said the command's fleet of C-130T and KC-130T airlift aircraft was on track for replacement by new KC-130J Super Hercules aircraft beginning in FY2023 with a three-aircraft procurement.
机译:海军预备役队长表示,其不良C-130T和KC-130T大力神运输机队的注资计划在2023年前进行注资,但其后备巡逻中队的注资情况尚不确定。在参议院拨款国防小组委员会于2018年4月17日作证时,副海军上将卢克·麦克科勒姆(Luke McCollum)表示,该司令部的C-130T和KC-130T空运飞机机队正准备在2023财年开始被新的KC-130J超级大力神飞机替换,三架飞机的采购。

著录项

  • 来源
    《Air International》 |2018年第6期|13-13|共1页
  • 作者

    Rick Burgess;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号