...
【24h】

Tanker Time Line

机译:思想时间表

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The first 767-2C-called a "provisioned freighter" because it has all the plumbing, decks, and connections needed to eventually make it into an all-up tanker-flew on Dec. 28, 2014. Another 2C and two all-up KC-46s, fully equipped with refueling booms and related equipment, will join the test force as well. Last year, Boeing recognized it had a problem with the KC-46 in that it had run some redundant wiring in bundles with the main wires. Rearranging those wires so they would be physically separated, and restringing them in test and production aircraft, added a delay to the program, the scope of which was still under discussion in late December.
机译:首架767-2C被称为“配备的货机”,因为它具有所有必需的管道,甲板和连接,最终使其在2014年12月28日成为一架全加油机。另外2C和两架全配备了加油机和相关设备的KC-46也将加入测试部队。去年,波音公司意识到KC-46出现了问题,因为它与主电线束捆绑了一些多余的电线。重新布置这些导线,使它们在物理上分开,然后在测试和生产飞机中重新捆扎,这对该程序造成了延迟,该范围的讨论仍在12月下旬进行。

著录项

  • 来源
    《Air Force Magazine》 |2015年第2期|53-53|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号