首页> 外文期刊>Air conditioning heating & refrigeration news >Project Files LEED Gold Sheet Metal Facility Retrofit
【24h】

Project Files LEED Gold Sheet Metal Facility Retrofit

机译:项目档案LEED金钣金设施改装

获取原文
获取原文并翻译 | 示例
           

摘要

In 2017, RenewAire moved into a 110,000-square-foot building and retrofitted it as one of the nation's few LEED Gold-certified industrial facilities.Now the manufacturer has completed an eight-month-long, multi-million dollar investment: automating its sheet metal fabrication process.The new equipment features a Salvagnini SL4 laser-punch, B3 press brake, and P4 panel bender.It reduces manufacturing critical-path time, saves space and energy, cuts production lead time up to 40%, and trims material waste.The towers' strategic positioning with the equipment sequential configuration combine for a time-saving fabrication production line.RenewAire's investment into an optional automated tool assistance add-on eliminates labor-intensive, hands-on B3 retooling setups.The towers' sheet metal inventory is conveyed 120 linear feet through the pre-programmed laser cutter, conveyance/part manipulation system,and panel bending equipment - all of which is automated.
机译:2017年,更新将其搬进110,000平方英尺的建筑物,并将其改装为全国少数利兹金认证的工业设施。现在,制造商已完成八个月长的多百万美元的投资:自动化其表 金属制造工艺。新设备采用Salvagnini SL4激光冲孔,B3按压制动器和P4面板BENDER.IT减少了制造临界路径时间,节省了空间和能量,将生产换乘时间降至40%,并修剪材料浪费 。塔楼的战略定位与设备顺序配置相结合,将节省的制造生产线组合。renewaire的投资进入可选的自动化工具辅助附加品,消除了劳动密集型的实践的B3重新安装。塔楼金属库存 通过预先编程的激光切割器,输送/部件操作系统和面板弯曲设备传送120个线性脚 - 所有这些都是自动化的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号