...
首页> 外文期刊>IIE Transactions >Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph
【24h】

Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph

机译:使用AND / OR图构造任务优先级图以解决拆卸线平衡问题的两种精确公式

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In this paper, the disassembly line balancing problem, which involves determining a line design in which used products are completely disassembled to obtain useable components in a cost-effective manner, is studied. Because of the growing demand for a cleaner environment, this problem has become an important issue in reverse manufacturing. In this study, two exact formulations are developed that utilize an AND/OR Graph (AOG) as the main input to ensure the feasibility of the precedence relations among the tasks. It is also shown that traditional task precedence diagrams can be derived from the AOG of a given product structure. This procedure leads to considerably better solutions of the traditional assembly line balancing problems; it may alter the approach taken by previous researchers in this area.
机译:在本文中,研究了拆卸生产线平衡问题,该问题涉及确定生产线设计,在该设计中,将旧产品完全拆卸下来,以经济有效的方式获得可用的组件。由于对清洁环境的需求不断增长,因此该问题已成为反向制造中的重要问题。在这项研究中,开发了两个精确的公式,利用AND / OR图(AOG)作为主要输入,以确保任务之间优先关系的可行性。还显示了传统的任务优先级图可以从给定产品结构的AOG中得出。该程序可以更好地解决传统装配线平衡问题。它可能会改变以前该领域研究人员所采用的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号