...
首页> 外文期刊>Africa energy intelligence >Volpi project still marking time in Pemba
【24h】

Volpi project still marking time in Pemba

机译:Volpi项目仍在奔巴打发时间

获取原文
获取原文并翻译 | 示例

摘要

Africa Energy Intelligence understandsrnthat the local boss of Orlean Invest inrnMozambique, Giorgio Pregel, is in talksrnwith the new chief of Empresa Nacionalrnde Hidrocarbonetos (ENH), Omar Mitha,rnto determine whether his company canrnstart working on the port of Pemba or not.rnOrlean Invest is due to build a logistic oilrnplatform at Pemba in conjunction withrnSociedade Portos de Cabo Delgado, arnjoint venture between ENH Logistics andrnCFM). But since Mozambique’s new president,rnFilipe Nyusi, came to office inrnJanuary the government’s backing for thernscheme seems to have wavered underrnpressure from Anadarko which fears thatrnOrlean Invest (headed by Italian businessmanrnGabriele Volpi) could perform inrnPemba as it has in its operations in Nigeria,rnwhere its services are highly expensive. Asrnwe indicated ( AEI 752), China HarbourrnEngineering Co., which is due to work onrnOrlean Invest’s behalf, still hasn’t sent anyrnof its equipment to Mozambique.
机译:《非洲能源情报》了解到,莫桑比克奥尔良投资公司的当地老板乔治·普雷格尔正在与Empresa Nacionalrnde Hidrocarbonetos(ENH)的新任负责人奥马尔·米莎进行会谈,以确定他的公司是否可以在奔巴港开始工作。计划与ENH Logistics和rnCFM之间的合资企业rnSociedade Portos de Cabo Delgado一起在奔巴建立一个物流平台。但是自莫桑比克新任总统菲利普·纽西(Filipe Nyusi)于1月上任以来,政府对这种方案的支持似乎已经动摇了阿纳达科的压力。阿纳达科担心,奥尔良投资公司(由意大利商人加布里埃勒·沃尔皮(Gabriele Volpi)领导)可能会像在尼日利亚开展业务那样执行英伦·彭巴。服务非常昂贵。 Asrnwe指出(AEI 752),应由Orlean Invest代表工作的中国港口工程有限公司,仍未向莫桑比克运送任何设备。

著录项

  • 来源
    《Africa energy intelligence》 |2015年第755期|4-4|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号