首页> 外文期刊>AAPG Explorer >New KU Geoscience Facility 'a Dream Decades in the Making'
【24h】

New KU Geoscience Facility 'a Dream Decades in the Making'

机译:新的KU地球科学机构“正在实现的梦想十年”

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Anew facility at the University of Kansas - and the philosophy behind it - are already generating new ideas and programs. The $78.5 million, 140,000-square-foot Earth Energy and Environment Center opened for classes in January and was formally dedicated in April. The state-of-the-art facility continues the university's embrace of a philosophy of integration in education, industry outreach and research in energy and environment, said Robert Goldstein, provost's special adviser on campus development and Haas distinguished professor in the Department of Geology. The design of the complex is open and transparent, bringing students and instructors closer together on a regular basis. Petroleum engineering and geoscience faculty and students in energy-related studies work together in the new facility.
机译:堪萨斯大学的新设施及其背后的哲学思想已经产生了新的想法和计划。这座耗资7850万美元,占地140,000平方英尺的地球能源与环境中心于1月开业,并于4月正式投入使用。教务长校园发展特别顾问,地质学系哈斯杰出教授罗伯特·戈德斯坦(Robert Goldstein)表示,最先进的设施继续体现了大学在教育,行业拓展以及能源与环境研究方面的整合理念。综合大楼的设计是开放和透明的,使学生和教师定期保持紧密联系。石油工程和地球科学学院的教授和能源相关研究的学生在新设施中一起工作。

著录项

  • 来源
    《AAPG Explorer》 |2018年第7期|14-15|共2页
  • 作者

    KEN MILAM;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号