首页> 美国卫生研究院文献>Scientific Reports >The Dynamic Changes in the Storage of the Danjiangkou Reservoir and the Influence of the South-North Water Transfer Project
【2h】

The Dynamic Changes in the Storage of the Danjiangkou Reservoir and the Influence of the South-North Water Transfer Project

机译:丹江口水库蓄水量动态变化及南水北调工程的影响

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Danjiangkou Reservoir is water source of Middle Route Project of the South-to-North Water Diversion (SNWD) Project, research on the dynamic changes in the water storage within the Danjiangkou Reservoir constitutes an important guide for reservoir water volume management practices. A practical method for estimating the water storage and its dynamics was proposed in this study based on inundated areas from Moderate Resolution Imaging Spectroradiometer (MODIS) observations between 2000 and 2016. The results show that the mean Danjiangkou Reservoir water storage was 10.548 billion m3 year−1. Significant seasonal changes (ρ < 0.01 in t-test) were observed with annual minima (~9.610 billion m3) occurring between February to July and annual maxima (~11.514 billion m3) occurring from August to the following January. Based on the monthly changes in the probability of the water supply, the guaranteed rate of water supply in the second half year (July–December) was higher than that during the first half year (January–June). The water supply in May was greatly deficient. In addition, the full guaranteed rate of the water supply over the past 17 years only accounted for 17.6%. Therefore, reservoir management practices should reduce the water released prior to May and reserve enough water according to the demands of water receiving areas to improve the efficiency of water resource utilization.
机译:丹江口水库是南水北调中线工程的水源,对丹江口水库内储水量动态变化的研究构成了水库水量管理实践的重要指南。本文基于中分辨率成像光谱仪(MODIS)2000年至2016年观测到的淹没区域,提出了估算储水量及其动力学的实用方法。结果表明,丹江口水库的平均储水量为105.48亿m 3 −1 。观测到显着的季节变化(t检验中的ρ<0.01),其中2月至7月之间出现年度最小值(〜96.10亿m 3 ),而年度最大值(〜115.14亿m 3 )发生在8月至次年1月。根据供水概率的每月变化,下半年(7月至12月)的保证供水率高于上半年(1月至6月)的保证供水率。五月份的水供应严重不足。此外,过去17年的全部供水保证率仅占17.6%。因此,水库管理实践应减少5月之前的放水量,并根据受水区的需求储备足够的水,以提高水资源利用效率。

著录项

  • 期刊名称 Scientific Reports
  • 作者

    Hai Liu; Jie Yin; Lian Feng;

  • 作者单位
  • 年(卷),期 -1(8),-1
  • 年度 -1
  • 页码 8710
  • 总页数 12
  • 原文格式 PDF
  • 正文语种
  • 中图分类
  • 关键词

  • 入库时间 2022-08-21 10:57:59

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号