首页> 美国卫生研究院文献>International Journal of Environmental Research and Public Health >An Interval Two-Stage Stochastic Programming Model for Flood Resources Allocation under Ecological Benefits as a Constraint Combined with Ecological Compensation Concept
【2h】

An Interval Two-Stage Stochastic Programming Model for Flood Resources Allocation under Ecological Benefits as a Constraint Combined with Ecological Compensation Concept

机译:结合生态补偿概念的生态效益约束下的洪水资源分配的两阶段随机规划模型

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The Momoge National Nature Reserve (MNNR) is located at the intersection of Nenjiang and Taoer Rivers in Baicheng City, Jilin Province, where the Taoer River is the main source of water for the nature reserve. However, due to the construction of the water control project in the upper reaches of the Taoer River, the MNNR has been in a state of water shortage for a long time. To guarantee the wetland function of the nature reserve, the government planned to carry out normal and flood water supply from Nenjiang River through the West Water Supply Project of Jilin Province. Therefore, how to improve the utilization of flood resources effectively has become one of the key issues of ecological compensation for the MNNR. In this paper, a flood resources optimal allocation model that is based on the interval two-stage stochastic programming method was constructed, and the corresponding flood resource availability in different flow scenarios of Nenjiang River were included in the total water resources to improve their utilization. The results showed that the proportion of flood resources that were used in the MNNR after optimization was more than 70% under different flow scenarios, among which the proportion of flood resources under a low-flow scenario reached 77%, which was 23% higher than the proposed increase. In addition, the ecological benefits of low, medium, and high flow levels reached the range of 26.30 (106 CNY) to 32.14(106 CNY), 28.21(106 CNY) to 34.49(106 CNY) and 29.41(106 CNY) to 35.94(106 CNY), respectively. According to the results, flood resources significantly reduce the utilization of normal water resources, which can be an effective supplement to the ecological compensation of nature reserves and provide a basis for the distribution of transit flood resources in other regions.
机译:莫莫格国家级自然保护区(MNNR)位于吉林省白城市的嫩江与陶尔河的交汇处,陶尔河是自然保护区的主要水源。然而,由于在Tao儿河上游的水利控制工程的建设,MNNR长期处于缺水状态。为了保证自然保护区的湿地功能,政府计划通过吉林省西部供水工程从嫩江进行正常和洪水供水。因此,如何有效地提高洪水资源利用率已成为MNNR生态补偿的关键问题之一。本文建立了一种基于区间两阶段随机规划方法的洪水资源优化分配模型,并将嫩江不同流量情景下的相应洪水资源利用率纳入总水资源量中,以提高其利用率。结果表明,在不同流量情景下,优化后的MNNR中洪水资源比例超过70%,其中低流量情景下洪水资源比例达到77%,比低流量情景下高23%。建议的增加。此外,低,中,高流量水平的生态效益达到了26.30(10 6 CNY)到32.14(10 6 CNY),28.21(10 6 CNY)增至34.49(10 6 CNY)和29.41(10 6 CNY)增至35.94(10 6 CNY) CNY)。结果表明,洪水资源显着减少了正常水资源的利用,可以有效补充自然保护区的生态补偿,为其他地区过境洪水资源的分配提供依据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号