According to the comparison of main characteristics and reserves of ore body round about the capital construction ore prospecting of a part of ore body,we have a probe into the control degree and network of ore body.The control degree of ore body in the original exploration is very thick.The interval can be appropriately widened in the production exploration of mine in order to decrease the engineering amount and cost.%对部分矿体基建探矿前后矿体主要特征及资源储量对比,探讨矿体控制程度和控制网度问题。原勘探工作对矿体的控制程度很高,矿山生产探矿可适当放稀间距,减少工程量,降低生产成本。
展开▼