首页> 中文期刊>人民长江 >Engineering Geological Problems of Levee Along Middle and Lower Reaches of Yangtze River

Engineering Geological Problems of Levee Along Middle and Lower Reaches of Yangtze River

     

摘要

The levee along middle and lower reaches of Yangtze, about 3 600 km long, was built mostly on loose quaternary deposit with changeful complicated formation and geologic defects. Hence, during flood season, dangerous events occur frequently, which imperil the levee’s safety and pose great threats to life and property of people behind the levee. According to the exploration and investigation results, a classification of subsoil profile is made. And then the analysis on main engineering geologic problems, i.e seepage failure of dyke and bank slope instability, is conducted. The internal relations between main engineering geologic problems and subsoil profile are found out, which provides a scientific basis for the design of strengthening dykes.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号