首页> 中文期刊> 《人民长江》 >向家坝水电站蓄水安全监测评价

向家坝水电站蓄水安全监测评价

         

摘要

为加强向家坝水电站蓄水期间的安全监测,对枢纽建筑物实施了变形(水平及垂直位移、接缝开合度和基岩变形)、渗流渗压以及应力应变监测,并开展了泄洪消能建筑物水力学专项监测工作,获取了大量监测数据。监测结果分析表明,大坝蓄水后,大坝主体、右岸引水发电系统、边坡等部位的变形、应力应变以及渗流渗压值均趋于稳定,变化规律基本合理。枢纽建筑物工作性态总体正常。%To strengthen the safety monitoring of Xiangjiaba Hydropower Station in the impoundment period , the deformation of the structures ( horizontal and longitudinal displacement , openings of joint and bedrock deformation ) , seepage and seepage pres-sure, and stress and strain were monitored .The special hydraulic monitoring was implemented to the flood release and energy dis -sipation structures.The results show that after the impoundment , the deformation, stress and strain and seepage pressure of the dam body, water diversion and power generation system at right bank and the side slope tends to be stable , and the variation law is reasonable .The operation of the hydro -complex structures is in a normal state .

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号