大型沉井群在向家坝水电站地基处理中的应用

         

摘要

向家坝纵、横向围堰均需修建在深厚覆盖层之上,如何选择技术经济性合理的地基处理方案关系到工程导流的成败。经反复研究比较,堰基深厚覆盖层处置确定采用由10个沉井组成的大型沉井群处理方案。侧重介绍了沉井群平面布置、结构设计和地下渗流控制方案,并且针对井间间距小、下沉深度大、覆盖层深厚及含大孤石地层差异性大等复杂条件,提出了沉井群下沉施工优化处理措施,将堆石混凝土施工技术应用于沉井填芯,取得了较好的工程经济技术效果。%The longitudinal cofferdam of Xiangjiaba Hydropower Station was built on deep overburden layer , therefore the se-lection of reasonable foundation treatment scheme was the key for the smooth construction diversion .After repeated comparison -selection and research , the large sinking well group composed of 10 sinking wells was determined .Through innovating the design concept of sinking well group , the thought of large sinking well with small interval was put forward and in the combination of the practical condition , the plane arrangement , structural design , underground seepage control were suggested .Aiming at the com-plicated conditions of small well interval , large sinking depth , thicker overburden layer , large difference of stratums containing big boulder , the optimized sinking construction measures were proposed .The rock filled concrete was applied to fill the sinking well, thus satisfactory technological and economical effects were obtained .

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号