Trough discussion on wind farm access system in power load center, this paper puts forward a suggestion of connecting distributed wind farm to the local 10 kV or 35 kV lines directly, and analyzes their advantages and measures need to be taken.%通过对用电负荷中心地区建设风电场的接入系统方式进行探讨,提出采用分散方式将风电场直接接入当地10kV或35kV线路的建议,并分析了其优点及需要采取的措施。
展开▼