The article introduces the online flow measuring principle and application of H-ADCP in Wangting.Contrastive analysis is made between H-ADCP date and manual monitoring data during water diversion and drainage period in 2010.The analysis shows that discharge measurement data using H-ADCP is credible and accurate.It strongly supports for the flood prevention work and Yangtze River to Taihu Lake water diversion project.%介绍了H-ADCP在线测流系统原理以及H-ADCP在望亭流量自动监测站中的应用。将2010年引江济太期间H-ADCP数据与人工缆道测流数据进行对比分析,结果表明H-ADCP测流数据合理准确,有力地支撑了太湖流域防汛防台和引江济太水资源调度管理工作。
展开▼