On the Xinjiang inland arid area of the PV grid -connected photovoltaic power station in Yuepuhu County , a 20 MWp project engineering division of soil and water conservation measures of protection design , the engineering measures , plant measures and temporary measures in the project area of soil erosion has been effectively controlled , to reduce the surface vegetation , disturbance and damage to the original landform.%对新疆内陆干旱区海润光伏岳普湖县并网光伏发电站一期20 MWp项目各个工程分区的水土保持防护措施设计,采用工程措施、植物措施及临时措施使项目区的水土流失得到有效控制,减少对原地貌、地表植被的扰动和损坏。