This paper describes program selection and construction methods of overflow surface concrete construction of Dayingjiang hydropower stations (level four) first hub project barrage. In view that the complex structure is difficult to achieve slipform construction, we can adopt bulk template, which is easy to operate, but the amount of preparatory work is large.%本文介绍了大盈江水电站(四级)首部枢纽工程拦河坝溢流面混凝土施工方案选择以及施工方法,对于复杂结构难以实现滑模施工时,可采用散装模板,简单易行、操作方便,但准备工作量大.
展开▼