Combining with the basement floor design of Shenzhen triple 220 kV substation comprehensive building, from the soil, raw materials, temperature and other aspects, analysed the cracking reasons of non load-bearing structure basement floor, and put forward the corresponding control measures, to guide practice, ensured the quality of basement project.%结合深圳三联220kV变电站综合楼地下室地面的设计,从填土、原材料、温度等方面入手,分析了非承重结构的地下室地面开裂的原因,并针对性地提出了相应控制措施,以期指导实践,保证地下室工程质量。
展开▼