Combining with water intake and water-break engineering conditions of Changshu rubbish burning power generation plant,the paper analyzes bad impact owing to pipe jacking crossing Yangtze levee,and puts forward some technological measures,such as applying slurry damper, soil grouting reinforcement treatment,measurement and axial control and so on,with a view to guarantee the engineering smooth.%结合常熟垃圾焚烧发电厂取退水工程概况,分析了顶管穿越长江大堤可能造成的不良影响,并提出采用减阻泥浆、土体注浆加固处理、测量及轴线控制等技术措施,以保证工程的顺利进行。
展开▼