Combining with actual status of turning grade crossing into grade separation of Tian-Han route of Ping coal mine area, the paper adopts cast-in-situ construction technology of overhead line, and describes overhead line, foundation excavation, frame box girder casting and other tech-nologies, so as to effectively guarantee and control engineering safety, quality, duration and cost as well.%结合平煤矿区铁路田韩线平交改立交工程的实际现状,采用了架空线路就地现浇施工工艺,并对线路架空、基坑开挖、框架箱涵现浇施工等技术进行了阐述,使工程安全、质量、工期、费用都得到了有效保证和控制。
展开▼