Is introduced in this paper Shandong energy Longkou Mining Group, Huadian oil shale mine in the technical renovation construction, according to the surrounding roadway layout and deformation, the track subinclined shaft winch room and contact Lane roadway layout, supporting method design optimization, to reduce the amount of roadway construction, improve the roadway support strength, improve the winch room ventilation conditions, for mine further technical renovation construction and mine production laid the foundation.%本文介绍了山东能源龙矿集团桦甸油页岩矿在技改施工中,根据周边巷道布置及变形情况,对轨道暗斜井绞车房及联络巷巷道布置、支护形式等进行了设计优化,减少了巷道施工掘进工程量,提高了巷道支护强度,改善了绞车房通风条件,为矿井下一步的技改施工及矿井投产奠定了基础。
展开▼