根据汕头站近远期线路引入情况, 结合既有铁路设施布局、地区车流特点及站址条件, 研究了多线引入条件下汕头站的改建方案, 从运输组织、动车段所设施分布、对在建工程影响、对旅客乘车影响等方面进行了比选, 确定汕头站改建方案.%Analysis lines that will introduce to station.According to the existing railway facilities layout in Shantou Station, the characteristics of the traffic flow in the area, the conditions of the roads under construction and many control factors, this paper study the reconstruction plan of Shantou station under the conditions of multi-line introduction. Finally, the comprehensive comparison and selection of the transportation organizations, the distribution of the facilities of the moving section, the impact on the construction in progress, and the impact on the passengers traveling by car are carried out. Finally, Confirmed the reconstruction of Shantou Station
展开▼