从大型石油化工装置EPC项目的四个阶段:投标报价阶段,设计阶段,采购阶段以及安装、施工、试车、开车阶段,对机泵专业可能存在的问题,进行细节研究,提出解决对策并归纳总结。为机泵专业设计人员在EPC项目中所面临的问题提出适应性建议,为优化专业设计提供坚实基础,从而实现EPC总承包项目的预期目标。%Problems may be occurred in all of four stages, which are abiding, design, procurement and construction, in EPC project of petrochemical plant. In this article, the details in these problems were studied, and then after summary was carried out, the countermeasures and the proposals for these problems were presented, which provides solid basis for optimization of pump and compressor design so that it is valuable to realize the expected EPC goal.
展开▼