The Procedure for Assembling the EAST Tokamak

机译:EAST Tokamak的组装程序

获取原文
获取原文并翻译 | 示例
       

摘要

Due to the complicated constitution and high precision requirements of the EAST superconducting tokamak, a meticulous assembling procedure and measurement scheme must be established. The big size and mass of the EAST machine's components and complicated configuration with tight installation tolerances call for a highly careful assembling procedure. The assembling procedure consists of three main sub-procedures for the assembling of the base, of the tori of the VV, the vacuum vessel TS and the TF, and of the peripheral parts respectively. Before the assembly, a reference framework has been set up by means of an industrial measurement system with reference fiducial targets fixed on the wall of the test hall. In this paper, the assembling procedure is described in detail, the survey control system of the assembly is discussed, and progress in the assembly work is also reported.
机译:由于EAST超导托卡马克的复杂结构和对高精度的要求,必须建立精细的组装程序和测量方案。 EAST机器的组件尺寸大,质量大,配置复杂且安装公差严格,因此需要非常仔细的组装过程。组装过程包括三个主要子过程,分别用于组装底座,VV的花托,真空容器TS和TF以及外围部件。在组装之前,已经通过工业测量系统建立了参考框架,其中参考基准目标固定在测试大厅的墙上。本文详细介绍了装配程序,讨论了装配的测量控制系统,并报告了装配工作的进展。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号