【24h】

Vacuum System for HL-2A Tokamak

机译:HL-2A托卡马克真空系统

获取原文
获取原文并翻译 | 示例
       

摘要

The vacuum system for HL-2A was built in 2003. The test results indicated that this system is feasible. It consists of three main parts: a pumping system, a pumping divertor and a glow discharge cleaning (GDC) system. For the pumping system, there are three main functions:(1) evacuating the vacuum vessel thus to produce an ultra high vacuum, (2) removal of impurities released during baking and (3) pumping during GDC. The pumping divertor controls the particles at the plasma edge and the GDC system provides a clean wall conditioning. During the first campaign of physical trial experiment on HL-2A, the ultimate pressure reached 4.6×10-6 Pa, and of ASDEX.
机译:HL-2A真空系统建于2003年。试验结果表明该系统是可行的。它由三个主要部分组成:泵送系统,泵送偏滤器和辉光放电清洁(GDC)系统。对于抽气系统,有三个主要功能:(1)抽空真空容器从而产生超高真空;(2)去除烘烤过程中释放的杂质;(3)在GDC期间抽气。抽气分流器控制等离子体边缘的颗粒,GDC系统提供干净的壁调节。在HL-2A的首次物理试验实验期间,极限压力达到4.6×10-6 Pa,达到了ASDEX。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号