首页> 外文期刊>石油科学(英文版) >Steam Flooding after Steam Soak in Heavy Oil Reservoirs through Extended-reach Horizontal Wells
【24h】

Steam Flooding after Steam Soak in Heavy Oil Reservoirs through Extended-reach Horizontal Wells

机译:稠油油藏蒸汽通过大范围水平井渗透后的蒸汽驱

获取原文
获取原文并翻译 | 示例
       

摘要

This paper presents a new development scheme of simultaneous injection and production in a single horizontal well drilled for developing small block reservoirs or offshore reservoirs.It is possible to set special packers within the long completion horizontal interval to establish an injection zone and a production zone.This method can also be used in steam flooding after steam soak through a horizontal well.Simulation results showed that it was desirable to start steam flooding after six steam soaking cycles and at this time the oil/steam ratio was 0.25 and oil recovery efficiency was 23.48%.Steam flooding performance was affected by separation interval and steam injection rate.Reservoir numerical simulation indicated that maximum oil recovery would be achieved at a separation section of 40-50 m at steam injection rate of 100-180 t/d; and the larger the steam injection rate,the greater the water cut and pressure difference between injection zone and production zone.A steam injection rate of 120 t/d was suitable for steam flooding under practical injection-production conditions.All the results could be useful for the guidance of steam flooding projects.
机译:本文提出了一种在单水平井同时注采生产的新开发方案,用于开发小型区块油藏或海上油藏,可以在较长的完井水平区间内设置特殊的封隔器,以建立注入区和生产区。该方法也可用于在水平井中进行蒸汽浸泡后的蒸汽驱。模拟结果表明,最好在六个蒸汽浸泡周期后开始蒸汽驱,此时油/蒸汽比为0.25,采油效率为23.48。蒸汽驱油性能受分离间隔和注汽量的影响。油藏数值模拟表明,注水速率为100-180 t / d时,在40-50 m的分离段可获得最大的采油量。蒸汽注入量越大,注入区与生产区之间的含水率和压差越大。在实际的注入生产条件下,蒸汽注入量为120 t / d适用于蒸汽驱。用于指导蒸汽驱项目。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号