首页> 中文期刊> 《新型建筑材料》 >塑木复合材料栏杆系统施工安装技木

塑木复合材料栏杆系统施工安装技木

         

摘要

The installation technique of wood-plastic composite guardrail directly affects its safety and service life. Installation technical requirements,structure performance requirements,installation steps and note points of wood-plastic composite guardrail system are discussed in this paper. Installation steps include preparation and installation of the following part:lining of post,post sleeve,top and bottom rail,skirt,railing support brackets-foot block and post cap. The aim is to provide a reasonable guideline for WPC guardrail installation.%塑木复合材料栏杆的安装技术直接影响其安全性及使用寿命.探讨了塑木栏杆系统施工安装技术要求,结构性能要求,安装具体步骤及注意事项.安装步骤包括:前期准备,内衬立柱安装,安装空芯塑木立柱,组装扶手、隔条和底部支撑块,安装上下扶手到立柱上,安装盖帽.本研究可对塑木栏杆的合理施工提供指导作用.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号