首页> 中文期刊> 《近代物理研究所和兰州重离子加速器实验室年报:英文版》 >Progress of a Prototype of Electron Accelerator of 1.5 MeV/300 mA under Construction

Progress of a Prototype of Electron Accelerator of 1.5 MeV/300 mA under Construction

         

摘要

SO2 & NOx in flue gas can be removed by electron beam, and composes some byproducts of (NH3)22SO4 and NH3NO3 under injecting NH3. The advantages of the technology are not byproducts of pollutant and lower fee of facilities and operation compared with normal FGD technology (GaO-CaSO4). Most power station is used by coal in China, there are total amount of 2000 tons of SO2 pollution in flue gas discharged out in the air. So the R & D of reduction SO2 & NOx by EB is signification.